Whirler Centrifugals Private Limited
Whirler Centrifugals Private Limited
Vatva, Ahmedabad, Gujarat
GST No. 24AAACW1729R1ZX
Send E-mail
Call 0804898343045% Response Rate
Home  » Our Products » 

Sewage Treatment Plant


Our product range includes a wide range of whirler wsp-132 two-stage parallel model self-cleaning sludge dewatering screw press, packaged sewage treatment plant, package stp plant and packaged stp plant.

Ask for Price

Price on Request: Get Latest Price

Product Details:
Capacity500 KLD
MaterialStainless Steel
Automation GradeAutomatic
Number Of Screws2
Body MaterialStainless Steel
BrandWHIRLER
Frequency50
Machine SizeWSP-132
Moisture80 Percent
Motor Power0.25HP

The WHIRLER WSP-132 two-stage parallel model self-cleaning sludge dewatering screw press is a highly efficient and easy-to-maintain machine that can be used to dewater a wide range of materials. It is a popular choice for dewatering applications in a variety of industries, including municipal wastewater treatment, industrial wastewater treatment, food processing, mining, and pulp and paper.

Here are some of the key features of the WSP-132:

Two-stage design for high efficiency
Self-cleaning for easy maintenance
Wide range of applications

The WSP-132 is a reliable and efficient dewatering solution that can help businesses save time and money.

Additional Information:
  • Production Capacity: 100 Per Month

Yes! I am Interested


  • +1
Get Best Quote

Approx. 1.5 Lakh / piece Get Latest Price

Product Details:
Minimum Order Quantity5 piece
Capacity (KLD/MLD)500 KLD - 1 MLD
Feed Flow Rate(m3/day or m3/hr)1000 m3/day
Application IndustryPharmaceutical & Chemicals
Treatment TechnologyActivated Sludge Process(ASP)
Impurities To Be RemovedOil and Grease
Water Sourcesewage and effluent end
Air Blower Power0.5 kW
Installation TypePrefabricated
Pore Size3mic
Automation GradeSemi-Automatic
Water Pump Power1 kW
Material Of ConstructionStainless Steel
Warranty1 Year
I Deal InNew Only
Reduction Of Dry Matter60
Control ModuleAvailable
Weight1.5 Ton
Land Occupation13X2
Filtration SystemMembrane
Disinfection Chamber Volume2m3
Aeration Chamber Volume20m3
Sludge Holding Chamber Volume20m3
Equalisation Chamber Volume10m3
Air Blower Count2
Air Blower Flow500 CFM
Manufacturing Lead Time60 Days
Approximate Power Consumption10KW
Overall Dimensions10mX2mX2m
Treatment StagesSecondary Treatment, Primary Treatment

MBR based packaged stp plant, which uses for commercial and industrial application water treatment. there would be membrane for filtration which elemenates clarifiers. which also add more benefits. Saving of land requirement and civil works. all fabricated plant skid mount only need to setup with system. all pipings comprises in skid mount and add aditional benefits.

Simple and easy installation, low operation and maintenance.

Installation of sewage treatment plants reduces risk to public health and the environment.

Sewage Treatment Process:

1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.

 

2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.

 

3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.

 

4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp




Additional Information:
  • Production Capacity: 100
  • Delivery Time: 60 Days
  • Packaging Details: Bare packaging

Yes! I am Interested


Get Best Quote

Approx. 2.5 Lakh / piece Get Latest Price

Product Details:
Minimum Order Quantity1 piece
Capacity (KLD/MLD)10 MLD
Feed Flow Rate(m3/day or m3/hr)10000 m3/day
Application IndustryMunicipal Corp
Treatment TechnologyMixed Bed Bio Reactor(MBBR)
Impurities To Be RemovedOil and Grease
Water SourceSewage
Air Blower Power2
Installation TypePrefabricated
Automation GradeSemi-Automatic
Material Of ConstructionMild Steel
Warranty1 Year
Control ModuleAvailable
Treatment StagesSecondary Treatment, Primary Treatment

Packaged STP are Membrane Bio Reactor based Sewage treatment and recycling plants. It is indigenously developedfor meeting stringent treated water norms for sewage water and various other ETP's. It works on principle of biologicaldigestion followed by specially designed submerged hollow fiber membrane filtration. Hollow fiber membranes havepore size of 0.06 micron which ensures removal of pathogens and bacteria in treated water. STP is acombination of membranes, pumps and other electrical equipment's which makes itself unique in operation and havinghassle free maintenance..

Simple and easy installation, low operation and maintenance.

Installation of sewage treatment plants reduces risk to public health and the environment.

Sewage Treatment Process:

1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.

 

2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.

 

3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.

 

4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp



Yes! I am Interested


REQUEST CALLBACK
Get Best Quote

Approx. 7.5 Lakh / Piece Get Latest Price

Product Details:
Minimum Order Quantity10 Piece
Capacity (KLD/MLD)1 MLD
Feed Flow Rate(m3/day or m3/hr)1000 m3/day
Application IndustryPharmaceutical & Chemicals
Treatment TechnologyMixed Bed Bio Reactor(MBBR)
Impurities To Be RemovedDissolved Minerals
Water SourceRaw water of any sewage and outflow line
Air Blower Power0.5 kW
Installation TypePrefabricated
Automation GradeSemi-Automatic
Material Of ConstructionMild Steel
Warranty1 Year
Control ModuleAvailable
Overall Dimensions5mX2mX5m
Treatment StagesPrimary Treatment, Secondary Treatment

Packaged STP Plant for, mall, Hospitals, Towers, All type of Hotels and laundry waste, Residential and food industry waste. from 10KLD to 10MLD projects. Prefabricated plant skid mount ready to plug in. low power consumption less space requirement compare to conventional method of sludge processing.

Simple and easy installation, low operation and maintenance.

Installation of sewage treatment plants reduces risk to public health and the environment.

Sewage Treatment Process:

1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.

 

2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.

 

3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.

 

4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp



Additional Information:
  • Item Code: PC0023
  • Production Capacity: 10 per year
  • Delivery Time: 60Days
  • Packaging Details: Open

Yes! I am Interested


Get Best Quote

Approx. 10 Lakh / Piece Get Latest Price

Product Details:
Minimum Order Quantity1 Piece
Capacity (KLD/MLD)500KLD
Feed Flow Rate(m3/day or m3/hr)101-500 m3/day
Application IndustrySugar Industry
Treatment TechnologyMixed Bed Bio Reactor(MBBR)
Impurities To Be RemovedOil and Grease
Water SourceRaw influent
Air Blower Power0.5 kW
Installation TypePrefabricated
Automation GradeSemi-Automatic
Deliver TypePAN India
Material Of ConstructionMild Steel
Warranty1 Year
Control ModuleAvailable
Overall Dimensions8mX4mX3m
Treatment StagesPreliminary Treatment

MBR plant packaged type, with export norms and flexible design aspect, with alumina and ceramic membrane. prefebricated unit..

Simple and easy installation, low operation and maintenance.

Installation of sewage treatment plants reduces risk to public health and the environment.

Sewage Treatment Process:

1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.

 

2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.

 

3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.

 

4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp



Yes! I am Interested


REQUEST CALLBACK
Get Best Quote

Approx. 10 Lakh / Piece Get Latest Price

Product Brochure
Product Details:
Minimum Order Quantity1 Piece
Capacity (KLD/MLD)5 KLD - 500 KLD
Feed Flow Rate(m3/day or m3/hr)101-500 m3/day
Application IndustryFood Industry
Treatment TechnologyMixed Bed Bio Reactor(MBBR)
Air Blower Power0.25 kW
Installation TypePrefabricated
Automation GradeSemi-Automatic
Impurities To Be RemovedOil & Grease, Dissolved Minerals
Material Of ConstructionMild Steel
Warranty1 Year
Treatment StagesPreliminary Treatment, Secondary Treatment, Primary Treatment
Control ModuleAvailable

Our Packaged STP treatment plants from 5 KLD to 500 KLD and more, provides an effective, easy-to-install and eco-friendly sewage treatment solution to residential colonies, hotels, hospitals, office complexes, sport complexes, clubs etc. These plants are not only energy savings, space savings, but also able to match strict demands of Environmental norms with reusing the water for irrigation, washing and cleaning.

Simple and easy installation, low operation and maintenance.

Installation of sewage treatment plants reduces risk to public health and the environment.

Sewage Treatment Process:

1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.

 

2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.

 

3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.

 

4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp




Additional Information:
  • Production Capacity: 200 Per Year
  • Delivery Time: 2 Week
  • Packaging Details: As Required

Yes! I am Interested


 






Corporate Brochure




 

 

Send SMS
Gopal Patel  (Director)
Whirler Centrifugals Private Limited
1213, Phase 3 G.I.D.C., Vatva
Ahmedabad - 382445 , Gujarat , India
Send E-mail
Share Us:
X