Ahmedabad, Gujarat
GST No. 24AAACW1729R1ZX
Call 08048983430 62% Response Rate
Send Enquiry
Minimum Order Quantity: 10 Piece
| Capacity (KLD/MLD) | 1 MLD |
| Treatment Technology | Mixed Bed Bio Reactor(MBBR) |
| Impurities To Be Removed | Dissolved Minerals |
| Water Source | Raw water of any sewage and outflow line |
| Air Blower Power | 0.5 kW |
| Installation Type | Prefabricated |
| Application Industry | Pharmaceutical & Chemicals |
| Feed Flow Rate(m3/day or m3/hr) | 1000 m3/day |
| Material Of Construction | Mild Steel |
| Automation Grade | Semi-Automatic |
| Warranty | 1 Year |
| Control Module | Available |
| Overall Dimensions | 5mX2mX5m |
| Treatment Stages | Primary Treatment, Secondary Treatment |
Simple and easy installation, low operation and maintenance.
Installation of sewage treatment plants reduces risk to public health and the environment.
Sewage Treatment Process:
1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.
2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.
3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.
4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp
Additional Information:
View Complete details
Minimum Order Quantity: 1 Piece
| Capacity | 500 KLD |
| Automation Grade | Automatic |
| Motor Power | 0.25HP |
| Material | Stainless Steel |
| Number Of Screws | 2 |
| Body Material | Stainless Steel |
| Brand | WHIRLER |
| Frequency | 50 |
| Machine Size | WSP-132 |
| Moisture | 80 Percent |
Additional Information:
View Complete details
Minimum Order Quantity: 1 Piece
| Bowl Diameter | 250 mm |
| Capacity | 1 m3/hr |
| Motor Power | 7.5 kW |
| Bowl Speed | 2500 rpm |
| Material | SS304 |
| Application | ETP sludge, STP sludge |
| Differential Speed | 5 rpm |
| Drive Type | Mechanical |
| Phase | Three Phase |
| Power Supply | 440 V |
View Complete details
Minimum Order Quantity: 5 piece
| Capacity (KLD/MLD) | 500 KLD - 1 MLD |
| Treatment Technology | Activated Sludge Process(ASP) |
| Impurities To Be Removed | Oil and Grease |
| Water Source | sewage and effluent end |
| Air Blower Power | 0.5 kW |
| Installation Type | Prefabricated |
| Application Industry | Pharmaceutical & Chemicals |
| Pore Size | 3mic |
| Feed Flow Rate(m3/day or m3/hr) | 1000 m3/day |
| Material Of Construction | Stainless Steel |
| Automation Grade | Semi-Automatic |
| Water Pump Power | 1 kW |
| Warranty | 1 Year |
| Reduction Of Dry Matter | 60 |
| Control Module | Available |
| Weight | 1.5 Ton |
| Land Occupation | 13X2 |
| Filtration System | Membrane |
| Disinfection Chamber Volume | 2m3 |
| Aeration Chamber Volume | 20m3 |
| Sludge Holding Chamber Volume | 20m3 |
| Equalisation Chamber Volume | 10m3 |
| Air Blower Count | 2 |
| Air Blower Flow | 500 CFM |
| Manufacturing Lead Time | 60 Days |
| Approximate Power Consumption | 10KW |
| Overall Dimensions | 10mX2mX2m |
| Treatment Stages | Primary Treatment, Secondary Treatment |
Simple and easy installation, low operation and maintenance.
Installation of sewage treatment plants reduces risk to public health and the environment.
Sewage Treatment Process:
1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.
2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.
3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.
4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp
Additional Information:
View Complete details
| Capacity | 75 KLD |
View Complete details
| Capacity | 75 KLD |
View Complete details
| Production Capacity | 500 Litre/Hour |
| Capacity | 50 L |
| Country of Origin | Made in India |
View Complete details
| Production Capacity | 500 Litre/Hour |
| Capacity | 50 L |
| Country of Origin | Made in India |
View Complete details
| Production Capacity | 500 Litre/Hour |
| Capacity | 50 L |
| Country of Origin | Made in India |
View Complete details
| Production Capacity | 500 Litre/Hour |
| Capacity | 50 L |
| Country of Origin | Made in India |
View Complete details
| Country of Origin | Made in India |
View Complete details
| Country of Origin | Made in India |
View Complete details
View Complete details
| Capacity | 75 KLD |
View Complete details
| Capacity | 75 KLD |
| Automation Grade | Semi Automatic |
View Complete details
| Capacity | 75 KLD |
View Complete details
| Material Of Construction | Mild Steel |
| Country of Origin | Made in India |
View Complete details
| Material Of Construction | Mild Steel |
| Country of Origin | Made in India |
View Complete details
Minimum Order Quantity: 1 Piece
| Automation Grade | Automatic |
| Capacity(KLD) | 50 |
| Country of Origin | Made in India |
View Complete details
Minimum Order Quantity: 1 Piece
| Automation Grade | Automatic |
View Complete details
Whirler's ETP Sludge Treatment Decanters are designed for efficient solid-liquid separation in effluent treatment plants. These centrifuges utilize centrifugal force to separate sludge from wastewater, resulting in dewatered sludge and clarified effluent. Key features typically include:
These decanters play a vital role in reducing sludge volume and improving the quality of treated wastewater.
View Complete details
Minimum Order Quantity: 1 Piece
| Material | Mild Steel |
View Complete details
Minimum Order Quantity: 1 Piece
| Type | Belt type |
| Usage/Application | Industrial |
View Complete details
Minimum Order Quantity: 1 Piece
| Capacity | 100LPH |
| Automation Grade | Automatic |
| Material | Stainless Steel |
| Separator | Yes |
View Complete details
Minimum Order Quantity: 1 Piece
| Capacity | 1000LPH |
| Automation Grade | Automatic |
| Material | Stainless Steel |
| Separator | Yes |
View Complete details
Minimum Order Quantity: 1 Piece
| Plant Type | RO Plant |
| Capacity | 250 LPH |
| Material of Construction | FRP |
| Automation Level | Automatic |
| Application | Industrial |
| Filter Media | Activated Carbon |
| Vessel Type | Vertical |
View Complete details
| Capacity(KLD) | 30 KLD |
| Material Of Construction | Mild Steel |
| Country of Origin | Made in India |
View Complete details
Minimum Order Quantity: 1 Piece
Product Brochure
| Treatment Technology | Mixed Bed Bio Reactor(MBBR) |
| Application Industry | Food Industry |
| Material Of Construction | Mild Steel |
| Air Blower Power | 0.25 kW |
| Installation Type | Prefabricated |
| Capacity (KLD/MLD) | 5 KLD - 500 KLD |
| Feed Flow Rate(m3/day or m3/hr) | 101-500 m3/day |
| Automation Grade | Semi-Automatic |
| Impurities To Be Removed | Dissolved Minerals, Oil & Grease |
| Warranty | 1 Year |
| Treatment Stages | Secondary Treatment, Preliminary Treatment, Primary Treatment |
| Control Module | Available |
Simple and easy installation, low operation and maintenance.
Installation of sewage treatment plants reduces risk to public health and the environment.
Sewage Treatment Process:
1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.
2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.
3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.
4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp
Additional Information:
View Complete details
View Complete details
View Complete details
View Complete details
View Complete details
Minimum Order Quantity: 1 Piece
View Complete details
Minimum Order Quantity: 1 Piece
| Plant Type | Water Softener |
| Capacity | 500 LPH |
| Material of Construction | Stainless Steel |
| Country of Origin | Made in India |
| Automation Grade | Automatic |
View Complete details
Minimum Order Quantity: 1 Piece
| Treatment Technology | Mixed Bed Bio Reactor(MBBR) |
| Application Industry | Sugar Industry |
| Material Of Construction | Mild Steel |
| Impurities To Be Removed | Oil and Grease |
| Water Source | Raw influent |
| Air Blower Power | 0.5 kW |
| Installation Type | Prefabricated |
| Capacity (KLD/MLD) | 500KLD |
| Feed Flow Rate(m3/day or m3/hr) | 101-500 m3/day |
| Automation Grade | Semi-Automatic |
| Deliver Type | PAN India |
| Warranty | 1 Year |
| Control Module | Available |
| Overall Dimensions | 8mX4mX3m |
| Treatment Stages | Preliminary Treatment |
Simple and easy installation, low operation and maintenance.
Installation of sewage treatment plants reduces risk to public health and the environment.
Sewage Treatment Process:
1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.
2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.
3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.
4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp
View Complete details
Minimum Order Quantity: 1 piece
| Treatment Technology | Mixed Bed Bio Reactor(MBBR) |
| Application Industry | Municipal Corp |
| Material Of Construction | Mild Steel |
| Impurities To Be Removed | Oil and Grease |
| Water Source | Sewage |
| Air Blower Power | 2 |
| Installation Type | Prefabricated |
| Capacity (KLD/MLD) | 10 MLD |
| Feed Flow Rate(m3/day or m3/hr) | 10000 m3/day |
| Automation Grade | Semi-Automatic |
| Warranty | 1 Year |
| Control Module | Available |
| Treatment Stages | Secondary Treatment, Primary Treatment |
Simple and easy installation, low operation and maintenance.
Installation of sewage treatment plants reduces risk to public health and the environment.
Sewage Treatment Process:
1. Preliminary Treatment: This is the first stage of the sewage treatment plant process and its main objective is the removal of coarse solids and other large materials often found in raw wastewater. Preliminary treatment operations typically include large filtering screens, grit removal and, in some cases, breaking of large objects. Excess grit causes severe pump blockages thereby affecting a range of subsequent treatment pumps. Flow measurement devices, often standing-wave flumes, are always included at the preliminary treatment stage.
2. Primary Treatment: The main purpose of this treatment is to reduce any heavy solids (organic & inorganic) that settle to the bottom by sedimentation while oil, grease & lighter solids float to the surface by skimming. The settled and floating materials are removed and the remaining liquid may be discharged oSTP or subjected to the next stage i.e. secondary treatment. Primary treatment removes about 60% of suspended solids from wastewater.
3. Secondary Treatment: The prime objective is the further treatment of the effluent from primary treatment to remove dissolved and suspended biological matter. The biological solids removed during secondary sedimentation, called secondary or biological sludge, are normally combined with primary sludge for sludge processing. Secondary treatment may require a separation process to remove the micro-organisms from the treated water prior to discharge or tertiary treatment. Secondary treatment removes more than 90% of suspended solids.
4. Tertiary/Advanced Treatment: Tertiary treatment generally follows secondary treatment and aids the removal of those wastewater constituents which cannot be removed in secondary treatment. Treated wastewater is sometimes disinfected chemically or physically (for example, by lagoons and microfiltration) prior to its discharge into the receiving environment (sea, river, lake, wetlands, ground, etc.)packaged sewage system, wastewater stp
View Complete details
| Capacity | 50 KLD |
View Complete details